Spastic Matters

Contains whatever hobbies, interests, or enlightenments I am currently having. Warning; it tends to be spastic.

Monday, September 12, 2005

Stage 3



Looks at out beautiful 3 car garge driveway. The poured driveway was drying when Chad and I went by on Sunday. I believe that marks the end of the third stage. The next stage is “Framing.” On our way out of the housing development, Chad pointed out a stack of wood with our address painted on it. I made Chad take a picture of it, because I was so excited to see it.

0 Comments:

Post a Comment

<< Home