Stage 3


Looks at out beautiful 3 car garge driveway. The poured driveway was drying when Chad and I went by on Sunday. I believe that marks the end of the third stage. The next stage is “Framing.” On our way out of the housing development, Chad pointed out a stack of wood with our address painted on it. I made Chad take a picture of it, because I was so excited to see it.
0 Comments:
Post a Comment
<< Home