Below is the list of stages our house goes through when being built. Already the house is on stage 3. I should have more pictures tomorrow.
Stage 1: Permit
Stage 2: Foundation
Stage 3: Backfill/Slab/Drain/Pour garage floor
Stage 4: Framing
Stage 5: Framing completion/Windows/Exterior Trim
Stage 6: 2nd Inspection
Stage 7: Insulation/Drywall stock and hang
Stage 8: Drywall tape and texture
Stage 9: Trim and Paint
Stage 10: Finish mechanical work such as tile, appliances, cabinet and countertop installation
Stage 11: Carpet and Clean
Stage 12: CLOSE
Stage 1: Permit
Stage 2: Foundation
Stage 3: Backfill/Slab/Drain/Pour garage floor
Stage 4: Framing
Stage 5: Framing completion/Windows/Exterior Trim
Stage 6: 2nd Inspection
Stage 7: Insulation/Drywall stock and hang
Stage 8: Drywall tape and texture
Stage 9: Trim and Paint
Stage 10: Finish mechanical work such as tile, appliances, cabinet and countertop installation
Stage 11: Carpet and Clean
Stage 12: CLOSE