Spastic Matters

Contains whatever hobbies, interests, or enlightenments I am currently having. Warning; it tends to be spastic.

Friday, August 19, 2005

Design Center-Complete





Chad and I are finished choosing all the options on the house. The only thing left to do is waiting for the build. Here are the upgrades we choose.

French style double doors for the master bedroom
Three-car garage
3.5-ton air conditioning
Two sinks in the master bathroom
Oval tub in the master bathroom
Upgraded water heater
Vaulted ceiling in the master bedroom
Stone instead on brick exterior
Upgrade to maximum capacity washer and dryer
Upgraded cabinets
Ceiling fan pre-wire in the master bedroom
Overhead lights in bedroom 1 and 2
Dedicated freezer plug in the garage
Upgraded carpet and pad
Hardwood floors in the entry, hallway, and kitchen
Upgraded baseboards
Silestone countertop in kitchen
Upgraded faucets in all bathrooms and kitchen
Stainless Steel kitchen appliances package

0 Comments:

Post a Comment

<< Home