The Stages

Below is the list of stages our house goes through when being built. Already the house is on stage 3. I should have more pictures tomorrow.

Stage 1: Permit
Stage 2: Foundation
Stage 3: Backfill/Slab/Drain/Pour garage floor
Stage 4: Framing
Stage 5: Framing completion/Windows/Exterior Trim
Stage 6: 2nd Inspection
Stage 7: Insulation/Drywall stock and hang
Stage 8: Drywall tape and texture
Stage 9: Trim and Paint
Stage 10: Finish mechanical work such as tile, appliances, cabinet and countertop installation
Stage 11: Carpet and Clean
Stage 12: CLOSE

Friday, August 26, 2005

Credit Approved

“CONGRATULATIONS! We are pleased to inform you that your mortgage loan for your new DR Horton a Melody Series home has been CREDIT APPROVED.”

Sincerely,
DHI MORTAGE COMPANY


I am not sure if that means we have a loan, or if our credit is approved to get a loan. Either way, it is good news.

Thursday, August 25, 2005

The Ground Is Moving


Finally, the ground is moving and we have a hole. We have a clearly dug basement ready and waiting for cement, which will happen in the next few days. I wanted to take a picture of the hole, but the entire street was blocked with huge cement trucks. Using the zoom on my camera, I was able to get a good picture of the cement truck from a block away. Although it is not our house the truck is working on, it is an interesting site. I will try to get a better picture tonight after the workers go home and the street clears. Not quite a foundation yet, but it is a start.

Monday, August 22, 2005

Moving Dirt



Although the house has yet to break ground, I think things are getting close to start. Here are the latest pictures of the land. Also, make sure to add this page to your favorites, so you can visit again for updates. Lastly don't forget to check out the links to the right; I update the wish list frequently.

Friday, August 19, 2005

Proud to own stainless steel





Chad wanted everyone to see our stainless steal appliances, because he is very proud of them. Here is an example of what ours will look like, along with our cabinet, floor, and countertop colors

Design Center-Complete





Chad and I are finished choosing all the options on the house. The only thing left to do is waiting for the build. Here are the upgrades we choose.

French style double doors for the master bedroom
Three-car garage
3.5-ton air conditioning
Two sinks in the master bathroom
Oval tub in the master bathroom
Upgraded water heater
Vaulted ceiling in the master bedroom
Stone instead on brick exterior
Upgrade to maximum capacity washer and dryer
Upgraded cabinets
Ceiling fan pre-wire in the master bedroom
Overhead lights in bedroom 1 and 2
Dedicated freezer plug in the garage
Upgraded carpet and pad
Hardwood floors in the entry, hallway, and kitchen
Upgraded baseboards
Silestone countertop in kitchen
Upgraded faucets in all bathrooms and kitchen
Stainless Steel kitchen appliances package

Tuesday, August 16, 2005

I am getting antsy

I am getting antsy about the house. It is still a big pile of dirt and we signed papers three weeks ago. I sent an email to DR Horton and here is the response.

From: Jennifer Sent: Monday, August 15, 2005 8:39 AMTo: Andrea
Subject: RE: What is the next step?
It has been three weeks since we contracted on a house, but haven’t heard anything about the construction of the house. Can you give us an update on when construction will begin?

From: Andrea Sent: Monday, August 15, 2005 4:23 PMTo: Jennifer
Subject: RE: What is the next step?

Hello Jennifer and Chad,

Your new home is still at "dirt" and is at stage #1.....Permit. There are 12 stages.....

Your new home's foundation could start at any time!.....probably within a couple of weeks.

You are welcome to drive by your home site at any time (please don't get out tho).....and once it is fully framed, we can take you out there if you call us for an appointment (Monday-Friday).....we will need to wear hard hats, of course and no one under the age of 18 is allowed on site.

Please do not hesitate to call or email us at any time. Once the framing starts it will go really fast!

Thanks!

Andrea, Cathy and Jacque

Wednesday, August 10, 2005

Design Center

Chad and I went to our second meeting at the design center. We have picked out everything from floor to ceiling. The only thing left to do is sign off on all the things we picked out, but that won’t happen until next week. Chad went a little over budget with the Silestone countertop and stainless steel kitchen appliances, but I think it will be worth it.

Tuesday, August 09, 2005

Revival



I can’t believe my last blog entry was in April. I have neglected the poor thing for so long, I almost forgot about it. Ninety percent of blogs are now orphaned and I am not going let Spastic Master become one of those statistics. I am here to revive Spastic Masters for the sole purpose of keeping everyone informed about our new house.

After months and months of looking Chad and I have found a house. We contracted on in two weeks ago. The house is around 128th and Holly, which is about one mile East of Colorado BLVD. It is a brand new house and will take 3-5 months to build. Check out the floor plan. We have had one appointment at the design center and have another one tomorrow. The build has yet to get started, but I suspect things will start soon.

Chad and I bought two new pieces of furniture for our new house. The first is a dinning room table with eight chairs. Second, to accent the table, Chad bought me a metal palm tree. I know it sounds funky, but trust me it will look swanky in our brand new house. The next thing to buy is a couch. As soon as we save a little more cash we plan to buy this one.

Much more to come, so keep checking in. Comments are fun to read so leave many.